AGA has been the engineering consultant for a design/build team that has constructed or modernized five schools for the School District of Palm Beach County.  In 2007, we were awarded the Annual Civil Engineering contract for Palm Beach Community College and have provided engineering solutions for all four campuses. AGA has provided structural services to Palm Beach Atlantic University since 2006 on an as-needed basis.


Palm Beach Community College Public Safety Training Center Palm Beach Community College Public Safety
Training Center
Lake Worth, Florida (2009)


Provide civil engineering services for master planning including paving, drainage and infrastructure utility expansion necessary to support the multiple phases of the project.  Preparation of construction documents and permits for Phase 1, Indoor Shooting Range.

Palm Beach Community College Facilities Department Palm Beach Community College Facilities Department
Lake Worth, Florida (2007)

Awarded Annual Civil Engineering Contract in October 2007.  Projects issued include but not limited to the following:

  • Tennis Court Conversion to Parking Lot (South Campus)
  • Fire Main Extension (Main Campus)
  • Bus Stop & Sidewalk (South Campus)
  • Loop Road Extension (Eissey Campus)
  • Cooling Tower Replacement (South Campus)
  • Tech Ed Building Plan Review (Belle Glade Campus)
  • Choir Riser Inspection ( Belle Glade Campus)
  • Library Column Evaluation (Eissey Campus)
  • Wellington Campus – Preliminary Drainage Study for Master Plan

Santaluces High School Concession Building Santaluces High School Concession Building – Forensic Study
Lantana, Florida (2007)


Performed a forensic study of the structure of a concessions building that was damaged by fire.  Prepared a demolition plan for removal of all debris and structural components that were damaged beyond repair.  Plan included a shoring scheme, demolition sequence and details.

Boca Raton Elementary RenovationBoca Raton Elementary Renovation
Boca Raton, Florida (2003)

Redesigned the site in accordance with current standards.  Site features included outdoor play areas, separated parking for faculty, buses and visitors and a new sanitary lift station.  On-site drainage was required to store a significant volume of stormwater due to the lack of existing drainage facilities in the surrounding area.
Back to Top

Lake Park Elementary School ModernizationLake Park Elementary School Modernization
Lake Park, Florida (2002)

Provided civil engineering design and permitting services to modernize the site.  The work included total replacement of all on-site water and sewer mains and paving and drainage, as well as design and permitting for water and sanitary mains located in the adjacent street right-of-ways.

Beacon Cove Intermediate School Beacon Cove Intermediate School
Jupiter, Florida (2001)

As part of design/build team, developed and designed water and sanitary sewer infrastructure, while protecting and minimizing disturbance of on-site wetland habitat.


Odyssey Middle School Odyssey Middle School
Boynton Beach, Florida (2000)

Civil engineering design and permitting for 34 acre campus.  This work included grading and drainage for the athletic fields, design of parking lots, driveways and off-site turn lanes, underground utility layouts, design and permitting of retention ponds and culvert crossings for entrance drives.

Independence Middle SchoolIndependence Middle School
Jupiter, Florida (2000)

As part of design/build team, developed site plans resulting in a successful blend of stormwater management and large green space to support the athletic activities of the school. 